• bwin·必赢(中国)唯一官方网站

    HOME SOLUTIONS

    Fujian Zhongmin Pinghai Bay Offshore Wind Farm Phase III

    This project includes two 220kV booster stations, with a total capacity of 900MW—300MW connected onshore and 600MW to Lúcí Island. To address high salt mist corrosion and voltage fluctuations in submarine cables, the project employs two 35kV/31Mvar (island) and one 50Mvar (onshore) SVG units for compensation.

     

    The SVG system is installed indoors, with outdoor water-air heat exchangers. The water-cooling system uses 316 stainless steel and C5 anti-corrosion standards. Since commissioning, the equipment has operated reliably, ensuring offshore wind power quality.


    1c7dbbac85724e9fbcecd209e166e937.png95d56134d08d4dcca23cec30bb3bb9c1.png

    Related Projects