• bwin·必赢(中国)唯一官方网站

    HOME SOLUTIONS

    Three Gorges Ulanqab Wind-Solar-Storage Integrated Project

    This pioneering 2GW hybrid wind-solar-storage integrated project comprises 1.7GW of wind capacity, 300MW of solar capacity, and a 550MW/1100MWh energy storage system. SIFANG’s multi-source coordinated control system employs a three-tier architecture—consisting of a centralized control center, coordination controllers, and station controllers—to enable the precise dispatch of wind, solar, and storage units. It provides grid-support capabilities for hybrid renewable plants, including peak shaving, load balancing, power smoothing, and primary frequency regulation.


    Related Projects

    友情链接: