• bwin·必赢(中国)唯一官方网站

    HOME SOLUTIONS

    Tibet Chamdo Tianhui 110kV Booster Station Reactive Power Compensation

    Located at an altitude of over 4,400m, this project faces extreme winter temperatures below -25°C. It utilizes a 35kV/14Mvar SVG unit housed in a containerized structure with built-in electric heating. This solution stabilizes 35kV bus voltage, improves power factor, and meets the stringent electrical performance requirements of high-altitude environments.


    image137.pngimage138.png

    Related Projects