bwin·必赢(中国)唯一官方网站

Home
About Us
Company Introduction
Enterprise Culture
Qualification and Honor
Management System
Legal Declaration
Contact Us
News
Solutions
Power Generation and Utilization
Power Transmission and Transformation
Power Distribution
DC Power Transmission and Power Electronics
Industry
Project Cases
Products
Supports
Language
Chinese
English

Turbine Shaft Torsional for the Turbine-generators at Hunterston (776.5MVA) and Torness (806MVA) Nuclear Generating Stations

Home > Project cases > Turbine Shaft Torsional for the Turbine-generators at Hunterston (776.5MVA) and Torness (806MVA) Nuclear Generating Stations

There is serial compensation capacitor on the transmission lines which connects the north part of National Grid System and the south part of Scottish Power Transmission System. For preventing the risk of sub-synchronous oscillation which leads to unit damage by shaft torsional vibration, SIFANG supplied sub-synchronous oscillation protection systems on synchronous generating units integrating GPS Clock Synchronizer at Hunterston B/Torness Nuclear Generating Station. Besides providing the required protection systems, SIFANG also supplied the design & engineering, testing, commissioning, training, S-N curve calculation and project management for this project.