bwin·必赢(中国)唯一官方网站

    Home
    About Us
    Company Introduction
    Enterprise Culture
    Qualification and Honor
    Management System
    Legal Declaration
    Contact Us
    News
    Solutions
    Power Generation and Utilization
    Power Transmission and Transformation
    Power Distribution
    DC Power Transmission and Power Electronics
    Industry
    Project Cases
    Products
    Supports
    Language
    Chinese
    English

    Turkey High-speed Railway Project

    Home > Project cases > Turkey High-speed Railway Project

    A total length of Ankara-Istanbul high-speed railway is 533km, the design speed of 250km, SIFANG have provided EMS in remote control center located in ESKIEHIR,a full set of protection and automation devices of 31 switching stations and 7 traction substations connected including KARAGÖZLER、KARAKÖY、OSMANELİ、KALBURCU、SAPANCA、ARIFIYE and OSMANELI in the project. Ankara-Istanbul high-speed railway project has been successfully put into operation and ensured the smooth opening of the high-speed railway.